Friday, October 12, 2007


This is the hallway (on the right) to the deli kitchen.
The stairs lead up to the offices above the deli.


This is the front of the building.
The large concrete box is the grease trap which will be buried.

This is a view of the front of the building. The black plastic was covering a sidewalk that was poured in the morning.
The orange lines on the asphalt are an outline of the landscape and parking lot. The front of the building will have an awning with a porch like effect.


This is a view of the west side of the building. We will have a sidewalk and grass for outdoor seating. To the right of this tractor is Allen Creek. It is a nice area for dining.

The window on the right is the cashier's window in the business office. On the left is bathrooms, break room, dry storage, mop closet.


The large window is the window for the cutting room on the retail floor. Meat cases will wrap around this area, just like our current counter and cutting room.


This is looking north down the hallway from the business office towards the retail floor. Where the scissor lift is will be wine and specialty grocery. By the front wall is the produce department.


This is a small picture of the rails that Batzer has built for the building.

Steady Progress


All coolers and freezers are installed. This is an entry to the custom cool down room off of the loading dock.


This is the deli with Jamie and Michelle's office up above. The deli is plumbed and wired and is awaiting sheet rock.

This is a view down the hallway of the coolers and freezers.